Home

 Gypsum Board 
Not many exterior shots today. The day is wet and the site muddy.  There is much to see inside however.



This is our only exterior shot.  The curb was cut today preparing the area for our driveway.


Gypsum board was delivered to the site.  It was spread out among the rooms.  
They placed it vertically.  In spots such as this one where the gypsum board
touched concrete, they placed spacers underneath to prevent them getting damp.


Gypsum board is first placed on the ceilings.


Gypsum Board is then placed on the walls.  It is placed horizontally to make it easier to tape and mud later.


A view of our bathroom exhaust fan.  It will exhaust to our soffit vent.  This prevents
putting another hole in our roof or exhausting out into the attic area (which isn't a good idea).


These insulation blankets placed on the concrete walls are a new requirement here in the city.  
Any exterior wall needs to be insulated at least four feet down from grade.


Here is a little detail I added for future remodeling.  since my Family Room will be finished, the only way to get wires from one end of my house to the other is through this chase.  I just added a piece of string from one end to the other.  Now I can more easily pull whatever wires I might need in the future.

<Prev   ~   Back to Top   ~   Next>