More siding is on the exterior. Each day there is a little more progress.
Most of what will be happening now is going to happen inside. We
did talk with the landscaper. He gave some suggestions and will price
out an option of sodding the whole yard versus just sodding the front and
seeding the back.
The front now has circletops! All that's left is the shutters and window
boxes.
The back is mostly done.
The two copper pipes coming up from the kitchen floor
will be inside the cabinet that will have the sink.
The pocket door is in place. There is a lot of work involved to get
it right.
The water heater and HVAC (Heating Ventilating and Air Conditioning) unit.
This is how the ducts arrive. some of them are just metal sheets which
the installer will form into the shape needed.
Copper water supply pipes are secured to the structure.
This supply vent is covered temporarily with a screen to protect it