 Final Walk-through 
The house is basically finished with a few things to adjust.  At this stage in the process the owner goes through the residence with the contractor and verifies that everything is completed.  If items are missing or not quite right they are put on a punch list.  Some money from the final draw is reserved until these items are completed.



A view of the front.


A view of our mailbox.  Always contact the Post Office for requirements.


Determining where to locate the house numbers was tricky.  Originally they were to have been placed over the garage doors but with vinyl siding they would have not set right.  By placing them on the corner board, they laid flat and didn't make a hole right up in the plywood underneath the siding.  


This is an extra feature we included - an outside keypad to open the garage door.  Now  if  we are working in the yard and need to get into the garage we don't have to go through the house.  It is battery operated and needs no wiring.


A view of the doorbell.  A wire runs through the grout and into the house.


A panoramic view of the Kitchen, Dining, Living Room.


A close up of the finished fireplace.  The switches by the fireplace turn on  a light in the niche and the blower fan that blows the warm air of the fire into the room.  The switch which turns on the fireplace is actually by the front door.  There is a requirement that the two switches must be separated.


Lights on the fireplace


A view of the Kitchen.


A close up of the cabinets.  We placed a cabinet face on the dishwasher so that it would match the cabinets since it was placed so close to the stove.


A finished view of the kid's bath.


A view of the finished niche.  This was captured space over the stairs.


A panoramic view of the Family Room.


Another view from a different direction.


A view of our water softener.  This was actually installed a few weeks after we moved in.